The solar power plant with a capacity (DC): 5 MWp produces electricity in the city Pusalotas, Lithuania, thanks to the Engimen’s systems: 2VSB and 4HEW For the most effective use of the land area, at the request of the Customer were used two systems 2 MWp to the East and West side and 3 MWp to the South side. By working on the project, Engimen designers and engineers performed the following services: structural analysis, soil survey, working design. The production and logistics were completed in a period of 9 weeks.